Product Detail :
|
Repairing and replacement work of fire protection hydrant line & pumps overhauling etc.as & when required basis at tps. work of on-line leak sealing services for high pressure & high temperature steam valves, flanges, lines etc. for unit no. 3 & 4 at tps on as & when require basis. work of online/offline cleaning/filtration of frf oil used in turbine governing hpsu and lpbp system hpsu at tps on as & when required. complete overhauling of cooling water pumps and cw make up water pumps for unit no. 3 & 4 on as & when required basis, at tps. supply of spares of various nozzle valves of oil gun station at tps. supply and application of metal protective compound on various pipes/structures/tanks of ash handling plant of unit no. 3 & 4 at tps. supply of ms hot dip galvanized grills for various locations of turbine maintenance department in unit no. 3 & 4 at tps.
|