Product Detail :
|
Construction of (i) 02 (two) Major Bridges , each having one span of 30.5 m Open Web Girder (welded through type) with roller and rocker bearings, as per RDSO's standard drawings in superstructure along with RCC Substructure and Open/ Pile foundations, (ii) 08 (eight) Minor Bridges having PSC slabs (post-tensioned), as per RDSO's standard drawings, in superstructure along with RCC Substructure and open foundations, (iii) RCC Retaining walls (about 4.5 km length), (iv) RCC drains (about 5 km), (v) RCC Service Structures, (vi) Service Roads (about 2 kms) and (vii) Other associated works, in connection with crossing/ diversion/ shifting of existing irrigation canals, pertaining to Sardar Sarovar Narmada Nigam Limited (SSNNL), in connection with Samlaya-Timba Road Gauge Conversion Project from Narrow Guage to Broad Guage (53.53 km), being executed by Dy.CE/Con/IV in Division.
|