Product Detail :
|
Current Repair /FDIR to Waghai Ahwa Road 59/6 to 94/2 Providing and Laying Precast Box Cell in Ch. 93/4 to 93/6 W1500mm X H1400mm X 2000mm and Ch. 93/8 to 94/0 W1500mm X H1400mm X 2000mm, and Providing and Laying 1200mm Pipe Culvert in Ch. 92/2 to 92/4).
|